News

Seminar held at the office of OJSC “SN-MNG”

On April 26, 2017, a seminar was held at the office of OJSC “SN-MNG” regarding “Repeated selective fracturing using “SpotFrac” technology” organized by the Department of Geological and Technical Measures and the Department of Oil Recovery Enhancement of OJSC “SN-MNG” together with “EWS” LLC . The seminar was attended by the management of OJSC “SN-MNG”, including all deputy directors, as well as representatives of other subsidiary companies of PJSC Read more…

News

Published Article in Coiled Tubing Time

In issue 59 of “Coiled Tubing Time” in the Technologies section, there was published an article “Progressive experience of performing selective re-fracturing with SpotFrac technology”. This article is a result of collaboration of specialists of EWS, LLC and Slavneft-Megionneftegaz, OJSC. To read the article click on the link: http://go.epublish4me.com/ebook/ebook?id=10092877#/26

News

New Level of Well Completion with possibility of MSF

In the 57th issue of Coiled Tubing Times in “Technologies” section was published an article “New Level of Well Completion with possibility of MSF (Mongoose Multistage Unlimited)”. The article is about the results of the last 14 months of pilot projects, conducting by LLC “Gazpromneft-Khantos”, “Gazpromneft-NTC” in partnership with LLC EWS To read the article click on Read more…

News

30-stage Hydraulic Fracturing

An operation with such characteristics has been performed in Russian oil and gas industry for the first time ever. Its implementation became possible due to use of new technologies. 30-stage hydraulic fracturing was carried out in a record-breaking for Yuzhno-Priobskoe field, horizontal section of the well, with a length of 1,5 thousand meters and a total length of well over 4,6 thousand meters. Read more…

News

1st SpotFrac in Russia

On 03.06.2016 the well stimulation was successfully carried out on the territory of Russia using re-frac method on SpotFrac technology by “EWS” company together with workover contractor on the well 11394 pad 93 Aganskoye field of “SN-MNG”, SJC. This work is unique on a global scale, snce it is the first work by SpotFrac technologies conducted under such difficult Read more…

News

Published Article in Coiled Tubing Time

n the 55th anniversary issue of Coiled Tubing Times in “Technologies” section was published an article “An Innovative Methods of Intelligent Well Completion with the Possibility of Re-Fracturing (Mongoose Multistage Unlimited)”. This article is the result of joint work of experts of several companies LLC “EWS”, Stratagen and “Gazpromneft- NTC”. To read the article Read more…

News

Participation in ICOTA conference

On October 29-30, 2015 our company took part in the 16th International Scientific and Practical Coiled Tubing, Hydraulic Fracturing and Well Interventional Conference, and made a presentation on the topic “The experience in the Use of “Mongoose” Multi-Stage Technology with Sliding Sleeves” Read more…

News

Conference OFFSHORE OIL AND GAS-2015

At the conference NEFTEGAZSHELF 2015 Russian companies with oil and gas companies are considering the possibility of their participation in the development of oil and gas offshore, establishing business contacts, and outline ways of further cooperation. Oil and gas companies have told about experience of working with contractors for offshore projects. Read more…

EN
RU EN